Insika
Insika Atlas · New York

New York
9% LIHTC Atlas

The New York 9% deal, from site to Form 8609: 11 milestones in order, each opening to its tasks, actions, proof packages and documents — what to do, why it matters, what proves it, and the rule it comes from.

Coming soon$500 a yearper state edition · renews until cancelled

In production. One email when it goes on sale — nothing else.

The New York 9% Atlas: milestones in order, each with one line of executive truth and its guide
The New York Atlas as a reader sees it: the milestones in order; each opens to its guide.
The pathway

11 milestones, from site to Form 8609.

Each milestone opens to its tasks, each task to its actions and the proof package it must produce. One line of each milestone's executive truth, as the edition reads today.

  1. Site Selection, Market Feasibility and Site ControlThis stage decides whether the deal has a site the application can rely on and a market case that can survive review.
  2. Predevelopment ClearancesPredevelopment Clearances decides whether the project has actually closed its environmental, historic and relocation exposure before design work builds on top of it.
  3. Predevelopment Design and Cost BasisPredevelopment Design and Cost Basis decides whether the project has one design and cost record every reviewer can trust, rather than a plan set, a waiver file and a cost estimate that each describe a slightly different building.
  4. Application Assembly, Scoring Strategy and SubmissionApplication Assembly, Scoring Strategy and Submission turns the approved concept into the transaction New York will actually review.
  5. Award, Reservation and Conditional CommitmentThis stage turns a favorable application result into the post-award baseline the closing team can actually run.
  6. Closing Readiness and Construction Financing ClosingThis stage turns an awarded transaction into a closing file that agency staff and counsel can actually execute.
  7. Construction, Draws and Progress ControlConstruction control is the proof bridge between field work and cash.
  8. Lease Up, Marketing and Placed in ServiceLease Up, Marketing and Placed in Service decides whether the public applicant process and each building's placed-in-service date can be defended from one file.
  9. Regulatory Agreement Execution and RecordationRegulatory Agreement Execution and Recordation decides whether approved affordability terms have become the enforceable land instrument that final allocation and operations can use.
  10. Cost Certification, Form 8609 and DTF-625 Final AllocationFinal allocation is not a document-collection exercise.
  11. Year 15, Qualified Contract and DispositionYear 15 is a rights-and-continuity stage, not an automatic exit.
Inside the edition

The guide, the Gantt and the calendar.

01

The guide

Every milestone, task, action, proof package and document of the New York 9% deal, written to be read, not recited — what this task validates, why it matters, where it sits, what “done” looks like, the watchouts, and the requirement it comes from.

02

The Gantt

The deal in time: how long the work takes, and which waits sit with the agency, the lender or the municipality, not with you. A gate closes every milestone, and the Gantt shows what the gate needs before it opens.

03

The calendar

New York's clocks — what starts each one, how long it runs, the condition it depends on and where the rule is written. The ones that decide a round, a reservation, a carryover, a placed-in-service date.

Who it is for

Developers, consultants and counsel who are responsible for knowing what a New York 9% deal requires, and for being right about it. If a new project manager could run your next application from it without asking you twice, it did its job.

An edition is one state and one program. It is read on the web, signed in; it is not a PDF. $500 a year per edition, renews until cancelled; your subscription carries every update.

When it is on sale

One email when the New York edition goes on sale. California 9% is on sale now.

Want the deal run, not only mapped?

Insika LIHTC OS plans the work from the Atlas and keeps the status true.